NUVO SOLUTION 05

DRAINAGE & DRAIN REFURBISHMENT

Nuvo installs and refurbishes drainage in operating facilities — channels, gullies, slot drains and sumps — integrated with the surrounding floor: falls formed to the drain, hygienic coving at junctions, and sealed terminations so water reaches the drain rather than running under the floor.

DRAINAGE & DRAIN REFURBISHMENT
Applications
  • Food and beverage processing areas
  • Commercial kitchens and wash-down zones
  • Effluent channels and sumps
  • Plant rooms and wet areas
Stainless steel drainage channel with grey grating running the length of a wet processing floor in a food facilityInstalled system

Slot drainage channel — food processing facility

The problem

Failed or poorly detailed drains cause ponding, hygiene risk and contamination spread. Around drains, screeds break down, terminations open up and effluent tracks beneath the floor instead of reaching the outlet.

The service

Nuvo installs and refurbishes drainage in operating facilities — channels, gullies, slot drains and sumps — integrated with the surrounding floor: falls formed to the drain, hygienic coving at junctions, and sealed terminations so water reaches the drain rather than running under the floor.

Assessment & preparation

Survey of falls, drain positions and condition, together with the volume and nature of the wash-down or effluent load and the state of the substrate around each outlet.

Systems used
  • Stainless steel and polymer drainage channels
  • Gullies, slot drains and sumps
  • Resin screeds and coving at drain junctions
  • Refurbishment and resealing of existing drainage
Installation & programme

Saw-cutting and breakout around the outlet, channels set to level and fall, bedding and jointing, then the surrounding floor reinstated and sealed. Work is phased section by section so the area keeps operating.

Quality checks
  • Falls verified to drain toward the outlet before floor reinstatement
  • Junction continuity checked at every channel and gully
  • Flushing or water testing where the drainage detail allows
  • Documented handover with maintenance guidance
CONTRACTING ENQUIRY

Request a site assessment or a quote.

Request a Quote — Nuvo Contracting

We use your details only to respond to your enquiry and manage our relationship with you, in line with POPIA. See our Privacy Policy.

Response within 1–2 business days