NUVO SOLUTION 06

ACID-RESISTANT LININGS & CHEMICAL PROTECTION

Nuvo specifies and installs chemically resistant lining systems selected against the actual exposure profile — concentration, temperature and dwell time — with full substrate preparation, detailing at penetrations and upstands, and holiday testing where required.

ACID-RESISTANT LININGS & CHEMICAL PROTECTION
Applications
  • Acid and chemical bunds
  • Process and plant rooms
  • Battery and dosing areas
  • Effluent channels and sumps
  • Mineral processing floors
Glossy amber chemical-resistant lining covering a concrete bund floor with raised equipment plinths and protruding anchor bolts, with pumps and pipework behindInstalled system

Acid-resistant lining to a chemical bund — plant and dosing area

The problem

Process areas, bunds and containment structures exposed to acids, alkalis and process effluent degrade rapidly. Concrete is attacked, reinforcement corrodes and contamination escapes the containment envelope.

The service

Nuvo specifies and installs chemically resistant lining systems selected against the actual exposure profile — concentration, temperature and dwell time — with full substrate preparation, detailing at penetrations and upstands, and holiday testing where required.

Assessment & preparation

Exposure survey covering the chemicals present, their concentration and temperature, and how long they dwell on the surface; substrate soundness and contamination checks; moisture testing where the slab is ground-bearing.

Systems used
  • Chemically resistant lining and coating systems
  • Substrate repair mortars ahead of lining
  • Detailing to upstands, penetrations and terminations
Installation & programme

Mechanical preparation to the required profile, substrate reinstatement, then lining applied in specified coats. Work is phased around plant operation where the area cannot be fully released.

Quality checks
  • Substrate profile and moisture verified before application
  • Wet-film and coat-count checks during application
  • Holiday (pinhole) testing where the system requires it
  • Documented handover with maintenance guidance
CONTRACTING ENQUIRY

Request a site assessment or a quote.

Request a Quote — Nuvo Contracting

We use your details only to respond to your enquiry and manage our relationship with you, in line with POPIA. See our Privacy Policy.

Response within 1–2 business days